Menu

Our Services

Partnering with organizations to navigate compliance, drive sustainability, and champion environmental stewardship with confidence.
01
Environmental Clearance & Regulatory Approvals
  • Environmental Clearence (Category B2 projects e.g Building & Construction Projects more than or equal to 20,000 sqm & below 1,50,000 sqm Total Built Up area)
  • Environmental Impact Assessment (Category A projects & Category B1 projects e.g Township & Area Development Projects more than or equal to 1,50,000 sqm Total Built Up area)
Environmental Clearance & Regulatory Approvals
02
Coastal Regulation Zone (CRZ)

It applies to activities near seas, rivers, creeks, estuaries, and backwaters influenced by tidal action. Any construction, industrial activity, or infrastructure project within CRZ limits must obtain prior approval. This ensures that fragile coastal environments are not adversely affected.

Key Benefit
EC & CRZ clearance ensures your project is legally compliant, environmentally sustainable, and protected from future legal issues or penalties.

Coastal Regulation Zone (CRZ)
03
Half-yearly Compliance Report of EC Conditions

Mandatory for each project having Environmental Clearance. Compliance status of all EC conditions every six months (June & December). The report includes updates on environmental management measures, monitoring data, and implementation status of safeguards. It ensures that the project is operating as per approved environmental norms.

Importance
Timely submission of six-monthly compliance reports is crucial to avoid legal action, project delays, or revocation of Environmental Clearance.

Half-yearly Compliance Report of EC Conditions
05
MoEF & CC Certified Compliance Report

This report confirms that the project is complying with all stipulated Environmental Clearance (EC) conditions. It is often required for project expansion, financial approvals, audits, or during regulatory inspections. The certification strengthens the project’s legal standing and environmental credibility.

The MoEF&CC Certified Compliance Report is an official compliance verification issued/endorsed by the Ministry of Environment, Forest and Climate Change or its Regional Office.

MoEF & CC Certified Compliance Report
06
Central Ground Water Authority (CGWA) NOC

The CGWA NOC (No Objection Certificate) is required for extraction and use of groundwater for industrial, infrastructure, mining, and large commercial projects. It is regulated by the Central Ground Water Authority under guidelines issued by the Government of India.This approval ensures that groundwater extraction is done in a controlled and sustainable manner without harming the natural water table. Any borewell installation or large-scale water withdrawal typically requires prior permission before operation begins.

Central Ground Water Authority (CGWA) NOC
07
Other Services Mandatory Requirements for EC & EIA
  • Environmental Management Plan (EMP)
    A structured plan to minimize environmental impacts during project construction and operation. It includes mitigation measures, monitoring plans, and sustainability practices.
  • Disaster Management Plan (DMP)
    A strategic framework to handle emergencies like fire, chemical spills, or natural disasters. It ensures preparedness, response actions, and risk reduction measures.
  • Project Feasibility Reports (PFR) & Detailed Project Reports (DPR)
    Detailed technical and financial evaluation of a project’s viability. DPR includes engineering design, cost estimation, and implementation planning.
  • Environmental Baseline Studies (Air, Water, Ground Water Quality, Noise, Soil, etc)
    Assessment of existing environmental conditions including air, water, soil, noise, and groundwater quality. Forms the foundation for EIA studies.
  • Environmental Monitoring
    Regular monitoring of environmental parameters to ensure compliance with regulatory standards.Helps track pollution levels and effectiveness of control measures.
  • NOCs & Statutory Approvals
    • Water NOC, Drainage NOC, Tree NOC
      Required approvals for water usage, sewage discharge, and tree cutting/transplantation. Ensures compliance with local and environmental regulations.
    • Fire NOC
      Approval from fire authorities confirming adequate fire safety systems in buildings or industries. Mandatory for occupancy and operational safety.
  • Water NOC, Drainage NOC, Tree NOC
    Required approvals for water usage, sewage discharge, and tree cutting/transplantation. Ensures compliance with local and environmental regulations.
  • Fire NOC
    Approval from fire authorities confirming adequate fire safety systems in buildings or industries. Mandatory for occupancy and operational safety.
  • Energy Efficiency Building Code (ECBC) Compliance & Shadow Analysis
    Ensures buildings comply with Energy Conservation Building Code and evaluates shadow impact on surroundings. Promotes energy efficiency and urban planning compliance. Essential for Environmental Clearance.
  • Carbon Footprint Assessment
    Measures total greenhouse gas emissions from a project or organization. Helps identify reduction strategies for climate responsibility. Essential for Environmental Clearance.
  • Geohydrology Report
    Study of groundwater availability, movement, and recharge potential in a project area. Essential for Environmental Clearance & water resource planning and CGWA approvals.
  • Traffic Analysis Report & Evacuation Planning
    Assesses traffic impact of a project and designs safe entry/exit and evacuation routes. Essential for large developments and high-occupancy projects. Essential for Environmental Clearance
  • Environmental Damage Assessment & Remediation Plan (Violation Cases)
    Evaluates environmental damage in non-compliance or violation cases and prepares restoration plans. Supports regulatory regularization and corrective action.
  • Land Use Analysis
    Study of existing and proposed land utilization patterns. Ensures compliance with zoning regulations and optimal land planning.
  • Ecological & Biodiversity Report
    Assessment of flora, fauna, and ecosystem sensitivity in the project area. Helps in conservation planning and impact mitigation.
  • Soil Investigation Report
    Detailed analysis of soil properties for construction suitability and stability. Includes bearing capacity, composition, and engineering characteristics.
  • Socio-Economic Report
    Study of project impact on local communities, livelihood, and infrastructure. Ensures balanced development with social responsibility.
  • Risk Assessment
    Identification and evaluation of operational, environmental, and industrial risks. Includes mitigation strategies to ensure safe project execution.
Other Services Mandatory Requirements for EC & EIA

What Our Clients Say?

We’ve empowered companies to meet their environmental goals with confidence — and we’d love to be part of your success story next.

We had an excellent experience working with the Envirotech team for our environmental clearance requirements.

Their professionalism, technical expertise, and prompt communication ensured a smooth approval process from start to finish. They provided valuable guidance at every stage and helped us navigate regulatory requirements efficiently. Their support enabled us to secure approvals on time and keep our project progressing as planned.

Thank you once again for your dedicated support and continued partnership. We look forward to working together on future projects.

BramhaCorp Limited

Your consultancy provides valuable support in MPCB consent renewals, statutory compliance management, and preparation of environmental monitoring reports.

The team (Mr Raj Jain & Mr. Sourabh) demonstrates good knowledge of regulatory requirements and ensures timely submission of documents and reports.

Your proactive approach, responsiveness, and assistance in addressing compliance-related issues have helped maintain environmental compliance and smooth regulatory operations.
We appreciate your continued support and look forward to the same level of commitment in the future.

Aditya Shitole

Senior Manager
Phoenix Mall

Envirotech has consistently demonstrated professionalism, technical expertise, and strong coordination in handling EC-related assignments and regulatory compliance activities. Their representatives present project details and environmental aspects with clarity and confidence, enabling effective discussions and informed decision-making. Overall, their quality deliverables, timely support, and effective communication make them a reliable environmental consultancy partner.

Panchshil Realty

Thank you for connecting with us. It was a pleasure to work on the Chakan project. The Envirotech team offered consistent, knowledgeable guidance throughout the engagement, which significantly streamlined our workflows and helped us meet key milestones on schedule. Their timely responses, technical expertise, and collaborative approach made coordination straightforward and reduced potential delays. We appreciate their professional support and look forward to the opportunity to collaborate again.

Prajakta Ponkshe

Senior Manager
KSH INFRA