Any industrial, commercial, or infrastructure project generating pollution must obtain necessary consents and authorizations before establishment and operation. MPCB(Maharashtra Pollution Control Board) ensures that pollution control systems are properly installed and maintained. These approvals help industries operate legally while minimizing environmental impact.
- Consent to Establish (CTE)
We assist in obtaining CTE before setting up any industrial project. Includes preparation of application, pollution load details, and required documents. Liaison with MPCB for smooth approval process. Mandatory prior to construction or installation.
- Consent to Operate (CTO)
Support in securing CTO after installation of plant and pollution control systems. Ensures compliance with emission and discharge standards. Includes documentation, inspection coordination, and approvals. Required for starting operations.
- Environmental Statement (Form V)
The Environmental Statement (Form V) is a mandatory annual submission under environmental regulations for industries/Infrastructure projects holding Environmental Clearance or Consent from MPCB
- Hazardous Waste Authorization
Assistance with all MPCB related Forms e.g Hazardous waste return (Form 4), Form III (E-Waste annual returns), Form VIII (Half yearly returns bulk consumer battery returns, Form 10 (Manifest for Hazardous and other waste) etc.
Key Benefit
MPCB approvals ensure your business operates legally, safely, and in full environmental compliance, reducing risks of penalties, shutdowns, or legal action.
No Increase in Pollution Load Certificate (SPCB)
This certificate is generally required during project expansion, modernization, or amendments in Environmental Clearance (EC) or Consent conditions. It assures authorities that emissions, effluent generation, and waste quantity will remain within approved limits. It helps in faster approvals without the need for fresh environmental studies in some cases.